Within the BRT Planning Guide, a template operational contract is provided based upon the Phase II contract for trunk services in the Bogotá TransMilenio system. The template provides the outline of the original contract. Here is provided the complete contract, at 183 pages in length with significant technical detail.
The BRT infrastrcuture cost calculator assists planners in assessing the various costs associated with construction of a new BRT system.
Sample Operator Contract
Download this document
Source: ITDP
Infrastructure Cost Calculator
Download this document
Source: ITDP